Case Studies 2
- Date December 19, 2019
Case Studies-III
You may also like
Case Studies 3
Objective: To optimize order cost and holding cost in inventory management
Solution Approach: Saw-Tooth model was applied to enable (replenishment vs consumption) just-in-time order implementation.
Results: Reduce lead time from 80% to 40% (approx. 5 days)
Technology Stack: SAP, Oracle, PIM, Informatica and Tableau
Case Studies 1
Objective: To do Mean time between failures (MTBF) analysis for a sample size of more than 1000. [MTBF is the probability of a mechanical or electronic devise/system to fail during normal system operation.]
Solution Approach: MTBF identified using Dynamic Tableau solution. The analysis was done on the basis of product data available in the organization which gave actual probability value based on the number of products returned to the organization.
Results:
- The company offered a longer factory warranty period
- Customer experience is increased by 18%
- Customer reorder is increased by 23%
Technology Stack: Tableau, Datameer and Oracle